1. Team sizes are limited to a maximum of 5; these teams may be formed in advance, or on the networking channel on our Discord server.

2. Projects should be developed over a 24-hour period (from 12PM March 27th to 12PM March 28th).

3. All projects must be submitted to a specific track. Each track has a best general winner submission along with a few others specific to each track.

4. There are event-wide challenges with elibigibility based on criteria on judging rubrics. Participants can also participate in sponsor-specific challenges independent of other event-wide challenges or sponsor challenges.